Hunter Valley Culverts and Bridges Upgrade

Hunter Valley, NSW
Australian Rail Track Coorporation
Sectors
Bridges
Rail

ARTC’s FY19 Annual Works Plan (AWP) included a large structures component for the replacement/upgrading of numerous culverts and bridges along the Main Northern and Ulan Lines within the Hunter Valley network, this package was awarded to Bridge and Civil. 

Culvert Replacements / Upgrades
The new culvert structures to be constructed in accordance with design documentation appropriate to the specific site. 
Site locations:

  • Lochinvar Culvert Reline (MN) – 203.844 km
  • Bylong Culvert Replacement (Ulan) – 380.105 km
  • Bylong Culvert Replacement (Ulan) – 380.505 km
  • Bylong Culvert Replacement (Ulan) – 381.019 km
  • Wilpinjong Culvert Replacement (Ulan) – 419.254 km
  • Breeza Culvert Replacement (MN) – 435.590 km
  • Breeza Culvert Replacement (MN) – 440.625 km

Bridge Replacements
The new bridge structures to be constructed in strict adherence to the design documentation.
Site Locations:

  • Togar UB Replacement (MN) – 303.964 km
  • Parkville UB Replacement (MN) – 323.680 km
  • Quipolly UB Replacement (MN) – 401.373 km
Coordinates of this location not found