The work under this contract comprised of replacing an existing steel transom top rail under bridge at 357.340km on the Main North rail line (Pages River, Murrurundi NSW) with a new concrete ballast top structure. The project was successfully completed in March 2016, and has since been selected as a finalist in the Civil Contractors Federation annual Earth Awards.