The bridge is situated on the Binnaway to Werris Creek line. The work consisted of the replacement of the existing concrete box culvert underbridge with a reinforced concrete ballast top structure. The new structure consists of concrete deck units placed on concrete piers that are connected to concrete driven piles, all concrete bridge components were precast by Bridge and Civil.