Singleton Culvert Replacement – ARTC
Spring Hill Culvert Replacement for John Holland CRN
Work involved the replacement of a damaged culvert on the Blayney to Orange rail line with 2 x 900 dia pipe culverts and headwalls. The dual tracks were cut and removed, the culverts installed in the 2.5m embankment and the tracks restored in a 2 day track possession.