Culverts and Bridges
ARTC’s FY19 Annual Works Plan (AWP) included a large structures component for the replacement/upgrading of numerous culverts and bridges along the Main Northern and Ulan Lines within the Hunter Valley network, this package was awarded to Bridge and Civil.
Client
Australian Rail Track Coorporation
Location
Hunter Valley
Project
Culvert Replacements / Upgrades
The new culvert structures to be constructed in accordance with design documentation appropriate to the specific site.
Site locations:
The new bridge structures to be constructed in strict adherence to the design documentation.
Site Locations:
The new culvert structures to be constructed in accordance with design documentation appropriate to the specific site.
Site locations:
- Lochinvar Culvert Reline (MN) – 203.844 km
- Bylong Culvert Replacement (Ulan) – 380.105 km
- Bylong Culvert Replacement (Ulan) – 380.505 km
- Bylong Culvert Replacement (Ulan) – 381.019 km
- Wilpinjong Culvert Replacement (Ulan) – 419.254 km
- Breeza Culvert Replacement (MN) – 435.590 km
- Breeza Culvert Replacement (MN) – 440.625 km
The new bridge structures to be constructed in strict adherence to the design documentation.
Site Locations:
- Togar UB Replacement (MN) – 303.964 km
- Parkville UB Replacement (MN) – 323.680 km
- Quipolly UB Replacement (MN) – 401.373 km