Binnaway
Severe scouring near the abutment of a bridge threatened the integrity of the bridge and required the installation of a massive gabion retaining wall. The base of the wall is 3 metres thick and rising 4 metres.
Client
Australian Rail Track Corporation Limited
Location
Embankment remedial works at Binnaway, 462.039km Werris Crk Line
Project
Construct gabion wall